Education

Simplicity Construction have experience in all forms of Building work within the Education environment, including Refurbishment and Maintenance, classroom alterations, extensions and external works. Simplicity Construction have undertaken various contracts for clients including Universities, Colleges and Schools across numerous regions.

  • Loxley School

    We were appointed by Loxley School to provide an extension to the current Key Stage 1 facility to provide a new toilet and shower unit. Works briefly comprised, ground works, stone cavity wall construction, mechanical, plumbing and electrical installations, new internal wall, floor and ceiling finishes with washroom fit out. The works were carried out over the school summer holiday period and handed back prior to the return of the young pupils.

     

    Contract Duration 6 weeks

    Contract sum £60,000.00

     

  • Sheffield College Hillsborough Centre

    We have carried out an extension to the Nursery facility to provide a new baby and wet play area. Works briefly comprised, detailed ground works, cavity wall construction, Fink type roof trusses with traditional standing seam copper roof coverings. Mechanical, plumbing and electrical installations, new internal wall, floor and ceiling finishes with washroom fit out. The works were carried out over the school summer holiday period and handed back prior to the return of the nursery after the summer break.

     

    Alongside the above project, we also constructed a timber clad building. All on a raft construction and receiving a green roof covering. We worked alongside the clients students, who provided the Mechanical, plumbing and electrical installations. There was also the requirement to provide extensive service trenches and ductwork across the campus site to facilitate the much larger construction of the extended campus project. The works were planned and procured in partnership with the estates management team, on a fully open book basis to guarantee best product and value for the campus.

     

    Contract Duration 10 weeks

    Contract sum £231,000.00

     

  • High Storrs School

    We have extended the dining room facility to provide extended space for this much well known grade II listed  building in Sheffield. The works compromised of very detailed ground works and drainage rerouting, steel structure and raft, cavity wall construction, metal deck roof and single ply membrane roof. Mechanical, plumbing and electrical installations, new internal wall, floor and ceiling finishes.

    Whilst carrying out the extension detailed above. We also carried out amendments and refurbishment to numerous classrooms, including the installation of solid grade laminate benching.

     

    Contract Duration 12 weeks

    Contract sum £192,000.00

     